SRD FAQ #8

FAQ Index

FN-10 / FW-10R Set up Procedure

  • Turn the FN-10 and FW-10R regulators fully counter clock-wise (closed).
  • Connect the customer facility lines to the N2 and DI Bulkheads on the SRD.
  • Turn on the N2 from the customer's facility.
  • Turn the FN-10 regulator clock-wise until the FN-10 pressure meter registers 20 PSIG.
  • Follow your normal start-up procedure (insert rotor, check actuator operation…etc).
  • Set Rinse time to 0 seconds, Dry 1 time to 60 seconds and Dry 2 time to 240 seconds.
  • Press start.
  • During either Dry cycle, turn the FN-10 regulator until the FN-10 pressure meter registers 30-35 PSIG.
  • Press stop.
  • Turn on the DI from the customer's facility.
  • Turn the FW-10R regulator clock-wise until the FW-10R pressure meter registers 20 PSIG.
  • Set Rinse time to 60 seconds.
  • Press start.
  • During the Rinse cycle, turn the FW-10R regulator until the FW-10R pressure meter registers 25-30 PSIG.

    FN-10 / FW-10R Set up Procedure pdf

Still have questions? Contact Rhetech Customer Service