Spin Rinser Dryer FAQs

FAQ Index

These FAQs are intended for use by trained personnel only. Before performing this or anywork
on your equipment, users should consult the relevant equipment manual and take all normal and recommended safety precautions. Improper servicing of this equipment could void any applicable warranty.

Don't see your question here? Contact Rhetech for technical support

9
Q. How Do I tell what model SRD controller I have?
A.
Semitool controllers
10
Q. How do I prepare SRD's for shipment to Rhetech for restoration or for storage?
A.
Decommision SRD procedure
11
Q.Can CY-20 still function without the pins?
A.
The CY-20 needs both of its pins to operate.
12
Q.What testing is performed prior to an SRD shipment?
A.
We do a complete final test on all of the SRD’s.
13Q.Why is there a constant N2 flow into the bowl ?
A.
This is the Low Pressure Purge (LPP).
14Q.We have a model 470s SRD with a 102 controller. The red "power/ot fault" LED stays lit on the Automation controller.
A.
The problem may be in the Automotion controller (LC-4).
15Q. What is the free actuator upgrade and what is the advantage?
A.
DI Valve Assembly upgrade advantage
A.
N2 Valve Assembly upgrade advantage
16Q.What’s the purpose and function of the DL-20 door lock?
A.
DL-20 doorlock

Still have questions? Contact Rhetech Customer Service

Rhetech, Inc. 416 South 4th Street, Coopersburg, PA 18036-2039, Phone 610.282.0105, FAX: 610.282.0789
©2008 All Rights Reserved. Rhetech, Inc.